Skip to content
MC2 Design Office
location_onul. Wadowicka 5, 30-347 Kraków
  • linkedIn
  • facebook
MC2 Design Office
  • Services
    • MEP INSTALLATIONS DESIGN
    • CONSTRUCTION-READY DESIGNS
    • BIM
    • PROJECTS WESTERN EUROPE
    • MODULAR AND PREFABRICATED CONSTRUCTION
    • BUILDING ENERGY SIMULATIONS CFD
    • FIRE AND SMOKE VENTILATION
    • PROJECT CONSULTANCY AND REVIEW
    • CONSTRUCTION INVESTMENT SERVICES
  • BIM
  • Projects
  • ABOUT US
    • ABOUT US
    • SOFTWARE
    • WE’RE PROUD OF / AWARDS
    • SKILLS DEVELOPMENT
    • TEAM
  • Contacts

Autor: mc2

New Project in Vienna
Projects in development

New Project in Vienna

We are excited to announce our new project in the center of Vienna! This ambitious renovation and expansion of an existing building will cover approximately 6,000 m². Our scope includes MEP sanitary and electrical installations,…

by mc2
27 marca 2025
chat_bubble_outline0
Read morearrow_forward
Thermal bridges - window blinds
Simulations and analysis

Thermal bridges - window blinds

Our office performs detailed calculations of thermal bridges. This time we had the opportunity to make calculations for thermal bridges created by using pre-wall blinds in windows on the ground floor of a newly designed…

by mc2
30 grudnia 2020
chat_bubble_outline0
Read morearrow_forward
CFD simulation for the operation of the monitor units cooling system.
Simulations and analysis

CFD simulation for the operation of the monitor units cooling system.

We provide CFD simulations and advanced calculations for HVAC industry. This time our task was to analyze the work of the cooling system of the monitor group. The subject of the analysis was the efficiency…

by mc2
7 listopada 2020
chat_bubble_outline0
Read morearrow_forward
Further development of qualifications - training in Navisworks software.
Developing skills

Further development of qualifications - training in Navisworks software.

Further development of qualifications – training in Navisworks software. We are freshly after another one of our planned trainings in the BIM designing cycle. This time we have undergone training with Navisworks software. This is…

by mc2
16 października 2020
chat_bubble_outline0
Read morearrow_forward
Apartments in the Aviators Park - building acceptances
Projects completed

Apartments in the Aviators Park - building acceptances

Residential buildings on Lema Street “Apartments in the Aviators Park” – building acceptances At the Lema street in Krakow on the home straight a construction of a complex of two multi-family residential buildings. Internal sanitary…

by mc2
11 października 2020
chat_bubble_outline0
Read morearrow_forward
Subsequent course is behind us - Revit Families (BIM)
Developing skills

Subsequent course is behind us - Revit Families (BIM)

Subsequent course is behind us – Revit Families (BIM) We are improving our skills in working with Revit. This time our designers have undergone 2 days of training in modelling Revit families. We made models…

by mc2
4 lipca 2020
chat_bubble_outline0
Read morearrow_forward
We became a member of the BIMKlaster association
Uncategorized

We became a member of the BIMKlaster association

We would like to inform with pleasure that we have become a part of BIMKlaster, an association that promotes and develops the idea of BIM in Poland. BIMKlaster associates pro-innovative and highly specialized micro, small,…

by mc2
24 kwietnia 2020
chat_bubble_outline0
Read morearrow_forward
Simulation of thermal comfort and air quality - DGNB certificate for production and storage building in Tczew
Projects completed Simulations and analysis

Simulation of thermal comfort and air quality - DGNB certificate for production and storage building in Tczew

Our company is involved in the energy simulations and analyses required to achieve DGNB certification. We wanted to present our latest project in this field. Recently we have made a simulation of thermal comfort and…

by mc2
30 marca 2020
chat_bubble_outline0
Read morearrow_forward
3D thermal bridge calculations - this time for the external facade of the building
Projects completed Simulations and analysis

3D thermal bridge calculations - this time for the external facade of the building

We have made further calculations of 3D thermal bridges for structural elements of the building’s external facade. We were looking for a solution to minimize the impact on the thermal conductivity of the partition while…

by mc2
19 marca 2020
chat_bubble_outline0
Read morearrow_forward
4th Conference Ventilation and Air Conditioning of the Future
Developing skills

4th Conference Ventilation and Air Conditioning of the Future

In order to be up to date with the latest solutions from the HVAC industry we participated in the 4th Ventilation and Air Conditioning of the Future Conference held in Warsaw on 2 March 2020.…

by mc2
3 marca 2020
chat_bubble_outline0
Read morearrow_forward

Nawigacja po wpisach

Prev 1 2 3 Next

Ostatnie wpisy

  • MagiCAD for Revit Training for MC2 Team
  • LEAN in Practice 7 Wastes – Session 2
  • LEAN in Practice 7 Wastes – Session 1
  • Another residental project in Warsaw
  • Calm has its own structure

Archiwa

  • lipiec 2026
  • czerwiec 2026
  • maj 2026
  • luty 2026
  • kwiecień 2025
  • marzec 2025
  • grudzień 2020
  • listopad 2020
  • październik 2020
  • lipiec 2020
  • kwiecień 2020
  • marzec 2020
  • listopad 2019
  • październik 2019
  • wrzesień 2019
  • czerwiec 2019
  • luty 2018
  • grudzień 2017
  • luty 2016

Kategorie

  • Bez kategorii
  • Developing skills
  • Industry news
  • Projects completed
  • Projects in development
  • Simulations and analysis
  • Uncategorized
Copyright 2026 All rights reserved by MC2 Projekty Sp. z o.o.
  • linkedIn
  • facebook
This website uses cookies to provide the highest level of service. Your further use of this website constitutes your agreement to its use.I Agree